摘要
某炼油厂新建 3台 12 5dam3储油罐位于沿海软土地区。通过计算及方案比较 ,采用了CFG桩与碎石桩组合型复合地基 ,此种地基加固处理在国内尚属首次。现场试桩及施工后复合地基的检测结果均满足设计要求。
Three new 125 dam3 oil tanks have been built at the coastal area where the soil is soft. The composite foundation of CFG pile and sandstone pile has been adopted based on calculation and scheme comparison and it is the first time for such technology to be used in domestic project. The demonstration conducted by petrochemical system specialists, pile test on site and the composite foundation inspection after construction show that the design requirements have been met.
出处
《炼油技术与工程》
CAS
北大核心
2004年第9期56-59,共4页
Petroleum Refinery Engineering