摘要 认为安装低压侧自动无功补偿装置的节点的无功功率较好地实现了无功补偿,使补偿后负荷的功率因数提高到0.95以上,建立了在部分节点安装低压侧自动无功补偿装置的配电网简化模型,分别以减少的有功网损最大和投资收益最高为目标函数,并采用惩罚函数的办法对低压侧自动无功补偿装置的安装数量加以约束,使之基本满足预算要求,以各个节点电压符合要求及各个设备不超过其电气极限为约束条件,在此基础上,采用遗传算法确定了低压侧自动无功补偿装置的最佳安装位置。文中给出了程序流程图和规划实例,结果表明提出的方法是可行的。 On the basis of the assumption that reactive powers of the nodes with automatic reactive compensation equipment (ARCE) are well compensated and the power factor of the corresponding nodes are over 0.95, a simplified model of distribution network with a number of ARCEs is established. A genetic algorithm is used to determine the optimal installation location of the ARCEs. The index of maximum reduction of active power losses and the index of the highest benefit-investment-ratio are used as the objective function respectively. The total number of ARCEs is restricted by using a punishable function to meet the requirement of the budget. The restricted conditions also include that the voltage of all nodes are within the desired range and that all the equipment does not overload. A block diagram of procedure and relevant example is given in the paper. The feasibility of the proposed method is verified by the results of an example.
出处 《继电器》 CSCD 北大核心 2004年第19期21-25,共5页 Relay
关键词 无功补偿装置 配电网 低压 优化规划 网损 无功功率 功率因数 投资收益 最大 预算 distribution network reactive power compensation reactive power optimization planning genetic algorithm
  • 相关文献

参考文献7

二级参考文献7

  • 1邓佑满,张伯明,田田.虚拟负荷法及其在配电网络动态优化中的应用[J].中国电机工程学报,1996,16(4):241-244. 被引量:45
  • 2陈保林.最优化理论与算法(Theory and methods of optimization)[M].北京:清华大学出版社(Beijing:The Press of Qinghua University),1989..
  • 3[1]Hus H Y , Kuo H C. Dispatch of capacitors on distribution system using dynamic programming[J]. IEE PROCEEDINGS-C, 1993, 140(6):433-438.
  • 4[2]Lu Fengchang , Hsu Yuanyih. Fuzzy dynamic programming approach to reactive power/voltage control in a distribution substation[J]. IEEE Transactions on Power Systems, 1997, 12(2):681-688.
  • 5[5]Hsu Yuanyih , Lu Fengchang. A combined artificial neural network-fuzzy dynamic programming approach to reactive power/voltage control in a distribution substation[J]. IEEE Transactions on Power Systems, 1998, 13(4):1265-1271.
  • 6Qiu J,IEEE Trans Power Syst,1987年,2卷,2期,287页
  • 7张鹏,刘玉田.配电系统电压控制和无功优化的简化动态规划法[J].电力系统及其自动化学报,1999,11(4):49-54. 被引量:48

共引文献126

同被引文献106

引证文献15

二级引证文献131

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部