摘要
采用部分无粘结预应力施工技术可有效解决因建筑物过长,温度变化引起裂缝问题,改善结构的受力状态,因此总结该技术工程实践具有一定的现实意义.对部分无粘结预应力施工技术在某工程中的应用进行了阐述和总结.
Application of non-cohesive prestress construction technology can effectively solve crack problems caused with the change of temperature when the length of a building is too long, and it can improve strength. So it is of realistic significant to sum up the experience of the technology. This paper introduces the application of the technology in an engineering project.
出处
《绍兴文理学院学报(自然科学版)》
2004年第9期73-75,共3页
Journal of Shaoxing College of Arts and Sciences