期刊文献+

基于剩余率求解非标准作业车间调度问题逆序算法 被引量:3

Reverse algorithm for solving nonstandard job-shop scheduling problem based on redundancy
下载PDF
导出
摘要 为了克服现有效率算法、遗传算法和逆序算法等求解非标准作业车间调度问题时存在的不足 ,提出了一种新的逆序算法。将非标准作业车间调度问题进行数学描述 ,给出目标函数 ,针对非标准作业车间调度问题的复杂性 ,构造了一种基于剩余率函数的逆序调度算法 ,以确定出最佳的开工日期。与其他算法相比 ,该算法的复杂性更小 。 To overcome shortcomings in current efficiency algorithm, genetic algorithm and reverse algorithm existing in non-standard job-shop scheduling problem, a reverse algorithm of solving Nonstandard Job-Shop Scheduling Problem (NJSSP) based on redundancy was put forward, The mathematical description of NJSSP was provided, object function was also given simultaneously. To deal with complexity of NJSSP, a reverse algorithm for solving NJSSP based on redundancy was constructed in order to define optimal staring time of every job. Compared with the other algorithm, the new algorithm has lower complexity and better scheduling result.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2004年第10期1238-1241,1256,共5页 Computer Integrated Manufacturing Systems
基金 黑龙江省自然科学基金资助项目 (F9914 )~~
关键词 作业车间调度问题 逆序 求解 遗传算法 目标函数 复杂性 构造 调度算法 日期 数学描述 job-shop scheduling due dates objective function
  • 相关文献

参考文献8

  • 1ZOMAYA A Y. Special issue:part 1 scheduling:theory and applications[J]. International Journal of Foundations of Computer Science, 2001,12(5):559-564.
  • 2BRIZUELA C A,NOBUO S. From the classical job shop to a real problem:a genetic algorithm approach[A].Proceedings of the 39th IEEE Conference on Decision and Control[C]. Sydney,Australia,2000.4174-4180.
  • 3WANG L, ZHENG D Z. A modified genetic algorithm for job shop scheduling[J]. International Journal Manufacturing Technology,2002, (20):72-76.
  • 4IMED K,SLIM H, PIERRE B. Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems[J]. IEEE Transactions on Systems, and Cybernetics--Part C:Applications and Reviews,2002,32(1):1-13.
  • 5WANG Haiying, WANG Fengru, LIU Qifeng. Solving nonstandard job-shop scheduling problem with due dates using bounding genetic algorithm[A]. Proceedings of the 3rd Word Congress on Intelligent Control and Automation[C].Hefei:Press of University of Science and Technology of China,2000.
  • 6王凤儒,徐蔚文,王凤林.基于序值编码的遗传算法及其应用[J].电机与控制学报,2001,5(1):64-68. 被引量:3
  • 7王凤儒,徐蔚文,徐洪副.用效率调度算法求解非标准作业车间调度问题[J].计算机集成制造系统-CIMS,2001,7(7):12-15. 被引量:9
  • 8康宁,王凤儒,刘丕娥,常会友.有交货期的单件车间调度问题的逆序算法[J].系统工程理论与实践,1999,19(12):25-30. 被引量:10

二级参考文献12

共引文献17

同被引文献28

  • 1习小英,邹海峰,王英明,姜莉莉.单件小批量生产作业计划的倒排产算法研究[J].现代制造工程,2004(9):5-6. 被引量:7
  • 2赵宁,吴超,宁汝新,唐承统.面向配做的柔性生产线调度[J].机械工程学报,2005,41(7):180-185. 被引量:9
  • 3曾立平,黄文奇.一种求解车间作业调度问题的混合邻域结构搜索算法[J].计算机科学,2005,32(5):177-180. 被引量:5
  • 4PanwalkarS.A survey of schedul in rules[J].Operation Research,1977,25 (11):45-61.
  • 5Lenstra J,Rinnooy Kan A,Brucker P.Complexity of Machine Scheduling Problems[J].Annals of Discrete Mathematics,1977,1:343-362.
  • 6Conway R W.Priority Dispatching and Job Lateness in a Job Shop[J].J of IndustrialEngineering,1965,16(4):228-237.
  • 7Baker K R.Sequencing Rules and Due Date Assignments in a Job Shop[J].ManagementScience,1984,30(9):1093-1104.
  • 8Vepsalainen A P J,Morton T E.Priority Rules for Job Shops with Weighted TardinessCosts[J].Management Science,1987,33(8):1035-1047.
  • 9Baker K R,Kanet J J.Job Shop Scheduling with Modified Due Dates[J].J of OperationsManagement,1983,4(1):11-22.
  • 10Raman N,Talbot F B.The Job Shop Tardiness Problem:A Decomposition Approach[J].EuropeanJ of Operational Research,1993,69(2):187-199.

引证文献3

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部