期刊文献+

10MW高温气冷实验堆吸收球停堆系统设备热态试验 被引量:1

Thermal equipment test of absorption sphere shutdown system of 10 MW high-temperature gas-cooled reactor
下载PDF
导出
摘要 碳化硼吸收球停堆系统是 10MW高温气冷实验堆的第二停堆系统 ,其功能是 ,在控制棒失效时 ,吸收球落入反射层的吸收球孔道 ,以达到紧急停堆的目的。介绍了在堆外、空气介质、150℃工作温度条件下 ,对吸收球传动机构设备进行的热态考验、传动试验和落球试验。结果表明 ,吸收球停堆系统 7套设备均达到了传动机构工作正常、落球时间在 3min之内、球位指示正确等设计要求。 7套设备安装到 10MW高温气冷实验堆上之后 ,在堆上进行了氦气介质下的热态落球试验 ,其结果达到设计规范的要求。 The boron-carbon neutron absorption sphere s hutdown system is the second shutdown system of the 10 MW high-temperature gas -cooled reactor. This second shutdown system is designed for emergent shutdown by spheres falling down into the reflector when the control rods are in failure. The seven sets equipment of the second shutdown system were checked in thermal air condition of working temperature 150 ℃ over 2 hours, its mechanical drivin g and spheres falling properties were also tested. The thermal test data indicat e that the seven sets equipment of the second shutdown system have good mechanic al drive, acceptable sphere falling time of less than 3 minutes and proper ball level indication. After the second shutdown system installed into the nuclear re actor, the properties of the absorption spheres falling time were further tested in thermal helium gas, and the results showed that the second shutdown system a chieved its design goals.
出处 《核科学与工程》 CSCD 北大核心 2004年第3期230-234,共5页 Nuclear Science and Engineering
关键词 10MW高温气冷实验堆 停堆 控制棒 氦气 反射层 碳化硼 空气介质 工作温度 传动机构 设备安装 high-temperature gas-cooled reactor absorption sphe re second shutdown system mechanical drive thermal performance test
  • 相关文献

参考文献3

  • 1钟大辛 秦振亚.10MW高温气冷实验堆的总体设计特性[J].核科学与工程,1993,13(4):28-36.
  • 2吴元强 程云升 等.HTR-10堆的两套控制停堆系统及其安全评价[J].核科学与工程,1993,13(4):109-114.
  • 3胡月东,徐元辉.10MW 高温气冷实验堆吸收球停堆系统的设计[J].核动力工程,1998,19(3):255-259. 被引量:3

共引文献5

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部