摘要
文章介绍了金哨水利枢纽工程引水洞衬砌施工所采取的模板工艺、钢筋工艺、砼工艺,以及回填灌浆和固结灌浆的施工,对施工中遇到的砼配合比及砼表面缺陷等问题,提出了改进措施。
The paper describes the technology for the formwork,arrangement of reinforcement,concrete construction,and grouting for filling and strengthening adopted during the lining of the diversion tunnel in Jinshao hydro-junction works.Modified measures were adopted to tackle such problems as mix ratio of concrete and defects in the surface of the concrete.
出处
《中国港湾建设》
北大核心
2004年第5期37-40,共4页
China Harbour Engineering
关键词
引水洞
衬砌
台车模板
底拱
侧拱
顶拱
冲天管
diversion tunnel
lining
trolley formwork
downside arch
lateral arch
upside arch
vent pipe