摘要
乌鲁木齐河东污水处理厂采用AB活性污泥工艺 ,设计日处理污水 2 0× 10 4m3 /d ,于 1997- 0 7投入运行 ,至今运行状况良好。本文介绍了该工程的工艺流程、设计参数、主要处理构筑物和运行情况 。
The AB process was applied in Urumqi Hedong sewage treatment plant,the capacity of design was 20×10~4m^3/d, it carried on in July 1997 and running well now. The process, design parameter?primarily builds and the problems in the operation were analyzed and discussed in this paper.
出处
《新疆环境保护》
2004年第2期5-9,共5页
Environmental Protection of Xinjiang