摘要
本文主要介绍了深圳蛇口工业区SCT二期陆域形成开山填海工程的爆破施工情况,提出了一些在城市复杂环境下爆破震动、爆破飞石、滚石等防治措施,对类似工程有一定的参考价值。
This paper gives an introduction to the blasting construction of filling sea by blasting mountain in the second phase of SCT for Shekou lndustrial Zone in Shenzhen, proposes the prevention measures for vibration,flying and rolling stones by blasting, for reference to similar construction in future.
出处
《铁道工程学报》
EI
2004年第3期76-80,共5页
Journal of Railway Engineering Society