摘要
介绍了干振碎石挤密桩的施工工艺及在宿迁市故黄河带处理砂土液化并提高承载力的成功经验。叙述了根据积累的工程经验 ,针对宿迁职业技术学院二期工程的具体的岩土工程条件 。
This paper have introduced the construction technicsof the compactness stake with crushed stone by shaking and the successful experienceof eliminate liquefaction of sand and enhancing bearing capacity of sandy soil in Huang-Fan district in the city of Xu Qian. It have narrated that on the basis ofthe accumulated experience of project we advised the designer to select the compactness stake with crushed stone by shaking to eliminate liquefaction of sand in the site of the second batch projects of the professional technical institute of Xu Qian and enhance the bearing capacity of soil layer in the site .
出处
《西部探矿工程》
CAS
2004年第12期67-69,共3页
West-China Exploration Engineering
关键词
干振碎石挤密桩
宿迁
加固
液化消除
the compactness stake with crushed stone by shaking
Xu Qian
reinforce
eliminate liquefaction