摘要
为了确保选矿厂房的安全 ,在摸清厂房牛腿柱开裂原因的基础上 ,合理地采用多种加固方法对其进行修缮 。
For insuring the safety of choosing mineral factory, on the basis of investigation the reason of the factory building's cow-leg pillar a variety of reinforcement methods are adopted reasonably and repair is made, which obtains ideal effects.
出处
《西部探矿工程》
CAS
2004年第12期147-148,共2页
West-China Exploration Engineering
关键词
牛腿柱
型钢加固法
加长基础截面法
局部拆除重砌法
cow-leg pillar
reinforcement method of steel shapes
method of lengthening fundamental section
rebuilding method of demolishing part