介绍了HG-220/9.8-I型锅炉采用STF-Ⅲ型双通道煤粉燃烧器技术改造后,炉内空气动力场测定,并对锅炉进行了的燃烧调整,并对运行中存在的问题提出相应的改造措施。
After the retrofit by STF-Ⅲ double channel burner of HG-220/9.8-Ⅰtype boiler, the aerodynamic test in furnace and combustion regulation is conducted for the boiler, and the related improved measures are put forward in view of the problems in operation.
出处
《电站系统工程》
北大核心
2004年第5期37-38,共2页
Power System Engineering