百万千瓦级压水堆核电厂大破口失水严重事故序列分析 被引量:1

下载PDF
导出
摘要 本文应用严重事故分析程序MELCOR,对百万千瓦级压水堆核电厂大破口失水事故叠加安注失效的严重事故序列进行了计算分析。分析结果表明在24小时内安全壳能保持其完整性,但内置换料水箱中的氢爆问题有待进一步研究。
作者 刘鑫 陈松
出处 《核电工程与技术》 2004年第3期12-16,22,共6页 Nuclear Power Engineering and Technology
  • 相关文献

同被引文献5

  • 1KNUDSON D L, REMPE J L. In-vessel retention modeling capabilities of SCDAP/RELAP53D[C]//Tenth International Conference on Nuclear Engineering. Arlington, USA: [ s. n. ], 2002: ICONE 10-22754.
  • 2SONG J H, KIM S B. On some salient unresolved issues in severe accidents for advanced light water reactors[J]. Nuclear Engineering and Design, 2005, 235: 2 055-2 069.
  • 3REMPEA J L, KNUDSONA D L. Corium retention for high power reactors by an in-vessel corecatcher in combination with external reactor vessel cooling[J]. Nuclear Engineering and Design, 2004, 230: 293-309.
  • 4THEOFANOUS T G. In-vessel retention as a severe accident management strategy, NURETH-8 [R]. Kyoto, Japan:[s. n. ], 1997.
  • 5THEOFANOUS T G, SYRI S. The coolability limits of a reactor pressure vessel lower head, center JBR risk studies and safety[J]. Nuclear Engineering and Design, 1997, 169:. 59-76.

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部