期刊文献+

电气主接线可靠性评估的区间方法 被引量:30

INTERVAL METHOD FOR POWER STATION AND SUBSTATION RELIABILITY EVALUATION
下载PDF
导出
摘要 提出了发电厂/变电站电气主接线可靠性评估的区间分析方法,同时提出了主接线方案经济分析的区间模型。该方法能够较为合理地将可靠性参数处理为区间数,在计算过程中全程考虑参数的不确定性。经1次计算即可得到反映所有(或任意)参数不确知风险影响的各个可靠性指标和经济性计算结果。由于区间值结果涵盖了已知风险因素,因此为决策者提供了更为科学和符合工程实际的定量评估数据。电气主接线可靠性评估的区间分析方法同时也是一种更新的、更为灵活和强大的多因素灵敏度分析手段。 The interval method for reliability analysis of power station/substation bus arrangements is proposed. Novel interval economic models for station/substation bus arrangements designs selection are presented as well. The interval component models for power station/substation interval reliability evaluation are given, which include circuit breaker model, busbar model and models of generator, transformer, transmission line and switches. Deconvolution formulae are applied to overcome the dependency problem and obtain sharp bounds of the results of reliability studies. The interval reliability evaluation and its results reflect the uncertainties associated with data throughout the analysis process, providing the quantitative value of uncertain risk and helping to select the optimal design. Interval analysis based station/substation reliability evaluation software is developed and applied to a large hydroelectric power station. All results demonstrate that the software is valid and effective. It provides a viable and easy-to-use tool for the power system planning, field engineering and operations. Furthermore, it is a flexible tool for sensitivity analysis.
作者 张鹏 郭永基
机构地区 清华大学电机系
出处 《电力系统自动化》 EI CSCD 北大核心 2004年第19期48-52,共5页 Automation of Electric Power Systems
关键词 发电厂/变电站 可靠性 区间分析 电气主接线系统 灵敏度分析 power station/substation reliability interval analysis bus arrangements sensitivity analysis
  • 相关文献

参考文献11

  • 1Billinton R, Chen H. Weaknesses of the Conventional Threestate Model in Station-oriented Reliability Evaluation.Microelectronic Reliability, 1997, 37(12) : 1799- 1804
  • 2Billinton R, Chen H, Zhou J Q. Generalized n+2 State System Markov Model for Station-oriented Reliability Evaluation. IEEE Trans on Power Systems, 1997, 12(4): 1511-1517
  • 3Billinton R, Chen H, Zhou J Q. Individual Generating Station Reliability Assessment. IEEE Trans on Power Systems, 1999,14(4): 1238-1244
  • 4CIGRE Working Group 13. 06. Studies on the Reliability of Single Pressure SF6-Gas High-voltage Circuit Breakers. 1996
  • 5Allen D J, White A. Transformer Design for High Reliability.In: Proceedings of IEE Conference on the Reliability of Transmission and Distribution Equipment. London (UK): IEE,1995. 66-72
  • 6CIGRE Working Group 23. 02. Report on the Second International Survey on High Voltage Gas Insulated Substations(GIS) Service Experience. Report 150, 2000
  • 7Forced Outage Performance of Transmission Equipment.Montreal (Canada): Canadian Electricity Association, 2000
  • 8IEEE Std 493-1997 (IEEE Gold Book). IEEE Recommended Practice for the Design of Reliable Industrial and Commercial Power Systems. 1998
  • 9张鹏(ZhangPeng).[D].北京:清华大学(Beijing:Tsinghua University),2002.
  • 10鲁宗相,郭永基.水电站电气主接线可靠性评估[J].电力系统自动化,2001,25(18):16-19. 被引量:51

二级参考文献1

共引文献51

同被引文献250

引证文献30

二级引证文献174