摘要
结合太平湾水电站大坝安全第二次定期检查进行了观测资料分析,了解了大坝的工作性态,对各观测项目进行了评价。
It has made an evaluation of each observing items in connection with observation materials acquired from the second periodic check-up of Taipingwan Hydraulic Power Plant.In the meantime,the working status of the dam is found out.
出处
《东北电力技术》
2004年第10期7-10,共4页
Northeast Electric Power Technology
关键词
大坝
定期检查
观测
资料分析
系统评价
Dam
Periodic check-up
Observation
Material analysis
System evaluation