期刊文献+

优先建设甘泽坡电站促进晋、秦界河水电基地的开发 被引量:1

Give Priority to The Construction of Ganzepo Plant to Promote the Development of The Hydranlic Power Generation Base in the Boundary River Between Shanxi Province and Shaanxi Province
下载PDF
导出
摘要 依据《黄河治理开发纲要》 ,分析比较了黄河北干流水利 6级开发规划中所余的古贤、碛口、甘泽坡 3个梯级的投资效益状况 ,提出优先开发干泽坡梯级具有更好的投资效益比 ,是开发晋、秦界河水电基地的首选项目的观点。 According to The programme for Huanghe River Control and Development, this paper analyzes the investment returns in the three steps of Guxian, Qikou and Ganzepo which are part of the Huanghe River north mainstream water conservancy Level 6 development planning, and proposes giving priority to the construction of Ganzepo plant and promoting the development of the bydraulic power generation base in the boundary river between Shanxi and Shaanxi provinces
作者 刘守忠
机构地区 天桥水电厂
出处 《电力学报》 2004年第3期194-195,199,共3页 Journal of Electric Power
关键词 水电基地 界河 黄河治理 干流 开发规划 水利 促进 优先 投资效益 项目 the water conservancy development of huanghe river hydraulic power generation the key water conservancy
  • 相关文献

参考文献2

同被引文献3

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部