摘要
采用矩阵综合法优化排除非优设计方案,使待评价方案的维数从七维降为四维数,方案数从6750个降为386个,再通过对的优化,使待评价总体方案的数量进一步降至8个.最后通过经济和技术评价方法确定了最终设计方案.
This paper excludes the no-optimizing design project by matrix synthesizing method. The dimensions of evaluating project are reduced from 7 to 4, and the number of project from 6750 to 386. By optimazing of the subgroup, the number of overall evaluating project are reducal to 8. Finally the design project is made certain by the evaluating method of economy and technique.
出处
《华东交通大学学报》
2004年第5期116-119,共4页
Journal of East China Jiaotong University