6Roemer T A, Ahmadi R, Wang R. Structuring product development processes[J]. European Journal of Operational Research, 2001, 130..539-558.
7Chen S J, Lin L. Decomposition of interdependent task group for concurrent engineering[J]. Computers &Industrial Engineering, 2003, 44 : 435-459.
8杨国强.装配流水线的总体设计[J].机械制造,1985(11):15-17.
9Roemer T A, Ahmadi R, Wang R. Structuring Product Development Processes [J]. European Journal of Operational Research, 2001, 130(3):539-558.
10Chen S J, Lin L. Decomposition of Interdependent Task Group for Concurrent Engineering [J]. Computers &Indus- trial Engineering, 2003, 44(3): 435-459.