摘要
作者以MATLAB中电力系统模块的结构和功能,结合某一水电厂开关站为仿真原形,在MAT LAB的Simulink环境下,建立了单台水轮发电机组及多台水轮发电机组并联运行、多路负载的开关站的仿真模型,并仿真了线路三相短路时,线路和水轮发电机的电流和电压的变化情况。通过对仿真结果进行分析,取得了较满意的仿真结果。
The authors analyzed the Power System Blockset in the SIMULINK of MATLAB, and developed a simulation model for a single hydropower generator self-controlled system, and a simulation model of a substation of a hydropower station with three hydropower generators and three distribution loads existing a point of phase-to-ground fault according to a single hydropower generator simulation model. The satisfactory simulation results were obtained from the analysis of the simulation.
出处
《四川工业学院学报》
2004年第3期82-86,共5页
Journal of Sichuan University of Science and Technology