河津电厂2×350MW机组FCB性能试验分析 被引量:6

sting and analysis of fast cut back (FCB) performance of 2x350 MW generating units in Hejin Power Plant
下载PDF
导出
摘要 机组快速甩负荷(FCB)是分散控制系统(DCS)在机组正常运行中,发电机解列时的一种重要保护功能,它可间接考核锅炉燃烧特性及汽轮机调节系统动态特性,作为新机组验收试验的手段之一,有极广泛的应用价值。河津电厂1、2号机组FCB性能试验在山西省尚属首次。通过本次试验,摸索出在FCB试验过程中机组的运行经验。文中详细介绍FCB试验过程中的动作情况,分析总结FCB过程对机组的影响及试验注意事项。 <abstract>st cut back (FCB) is an important protective function of DCS system when the generator is tripped off during the normal operation of unit. It can indirectly examine the combustion characteristics of boiler and the dynamic characteristics of turbine governing system, which can be widely used as a way of acceptance test for new unit. It was the first time in Shanxi Province to carry out the FCB test on No. 1 and No.2 units of Hejin Power Plant. Through this time test, the operation experience of unit during the test of FCB was found out. This paper details the actuating conditions of FCB during test, analyzes and sums up the impact of FCB process on the unit and the matters needing attention during the test.
作者 戴光 周强民
出处 《中国电力》 CSCD 北大核心 2004年第11期71-74,共4页 Electric Power
关键词 火电机组 FCB试验 速度不等率控制回路 <keyword>ermal power unit FCB test DROOP loop
  • 相关文献

参考文献4

  • 1朱北恒.RB控制技术试验研究[J].中国电力,2004,37(6):67-70. 被引量:48
  • 2戴光,张鲁凡,姜云亮,等.山西河津电厂1、2#机组CCS系统调试报告[R].山西省电力科学研究院,2000.
  • 3戴光,张鲁凡,姜云亮,等.山西河津电石1、2#机组FCB系统调试报告[R].山西省电力科学研究院,2000.
  • 4边立秀 周俊霞.热工控制系统[M].北京:中国电力出版社,2001..

二级参考文献10

共引文献53

同被引文献39

引证文献6

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部