摘要
通过对瀑布沟水电站的河床截流模型试验研究,比较了不同戗堤方案,获得了截流过程龙口的水流特性,对不同时期(不同来流流量)截流做了详细的预测和分析,为截流工程的实施提供了科学依据。
The paper compares the various beam schemes according to the study on hydraulic model test of river closure in Pubugou hydropower station, obtains the water flow characteristics of river closure breach, analyses and forecasts the river closure in various periods, provides the scientific basis for river closure construction.
出处
《东北水利水电》
2004年第11期32-34,共3页
Water Resources & Hydropower of Northeast China
关键词
截流
模型试验
瀑布沟水电站
river closure
model test
Pubugou hydropower station