期刊文献+

大跨度斜拉桥的施工非线性倒拆分析 被引量:14

NONLINEAR STATIC REVERSE ANALYSIS OF LONG-SPAN CABLE-STAYED BRIDGES DURING CONSTRUCTION
下载PDF
导出
摘要 以斜拉桥静载弯曲能量作为目标函数,综合考虑斜拉索垂度效应、梁柱效应和大位移效应,并采用混合法求解系统方程,确定斜拉索成桥时的初始张拉力。以由此确定的斜拉桥初始状态作为施工非线性倒拆分析的初始状态,倒拆分析的过程中需要考虑相应阶段的混凝土收缩、徐变影响,倒拆分析的结果作为斜拉桥施工阶段的斜拉索张拉力,即斜拉桥施工阶段的最终优化结果。该方法经过算例验证,取得了较好的结果,为斜拉桥的施工控制提供了依据。 This paper is concerned with the nonlinear static reverse analysis of long-span cable-stayed bridges during construction. The bending strain energy of cable-stayed bridge is chosen as the objective function, and an iterative-incremental procedure which considers the cable sag effect, beam-column effect and large displacement effect is described to solve the nonlinear system equation and calculate the initial cable forces of a cable-stayed bridge. The influence of concrete creep and shrinkage is considered and the initial shape of cable-stayed bridge is chosen as the first step. The results of nonlinear reverse analysis are used as the cable forces of cable-stayed bridge during construction, that is, the optimal results of the cable-stayed bridge during construction.
作者 辛克贵 冯仲
出处 《工程力学》 EI CSCD 北大核心 2004年第5期31-35,共5页 Engineering Mechanics
基金 北京市自然科学基金(8982010)
关键词 斜拉桥 非线性 倒拆分析 收缩 徐变 Bending strength Construction Creep Numerical methods Reverse engineering Shrinkage
  • 相关文献

参考文献2

  • 1[1]Wang P H, Tseng T C, Yang C G. Initial shape of cable-stayed bridges[J]. Computers & Structures, 1993, 47: 111-123.
  • 2[4]Nazmy A S, Abdel-Ghaffar A M. Three-dimensional nonlinear static analysis of cable-stayed bridges[J]. Computers & Structures, 1990, 34: 257-271.

同被引文献103

引证文献14

二级引证文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部