摘要
济钢第二炼铁厂1#高炉因操作过急、风口配置不合理、原燃料波动等原因,出现悬料、崩料、偏料以及冷却壁水温差变化等炉墙结厚征兆,影响了高炉的正常生产,各项技术经济指标恶化。利用高炉计划检修的机会,采用炉喉加喷水管控制顶温的降料面操作,使炉墙结厚物大部分脱落,达到了预期目的。
Because of previously operating, unreasonable collocation of the tuyeres, fluctuant quality of the raw material and fuel etc., the omens of 1~# BF wall accretion such as the hanging, slip, uneven charge level and variational temperature difference of water in cooling stave and so on appeared, then the normal production of the blast furnace was influenced and technical and economic indexes worsened in No.2 ironmaking plant of Jigang. Therefore lowering charge level operation is adopted through controlling the top temperature by adding spray pipe in the furnace throat to make the scaffolds falling off mostly and the anticipative intention is reached.
出处
《山东冶金》
CAS
2004年第5期8-9,共2页
Shandong Metallurgy
关键词
高炉
炉墙结厚
降料面
炉况
blast furnace
BF wall accretion
lowering charge level
furnace conditions