某发电厂厂址位于某弯曲河道凸岸,本文结合厂址具体情况,采用水面曲线法推求了厂址P=1%设计洪水位,为厂址阶梯式布置提供了依据。
A power plant lies on the convex side of a warping river. In this paper, water surface curve method is proposed to compute P=1%design flood level of power plant, which provides the basis for the ladder layout of power plant.
出处
《山东电力技术》
2004年第6期61-62,80,共3页
Shandong Electric Power
关键词
弯曲河道
厂址设计洪水位
warping river