期刊文献+

清江水布垭电站现场固结灌浆试验与分析

Esperiment and Analysis of Consolidation Grouting in Site of Qingjiang Shuibuya Hy dropower Station
下载PDF
导出
摘要 介绍了清江水布垭电站在运行水头高、灌浆盖重轻、层状岩体倾角平缓、岩溶构造发育等不利条件下,现场固结灌浆的试验方法与工艺,并对试验数据进行分析,得出了固结灌浆施工必需的设计参数,为复杂条件的固结灌浆积累了经验,供同类大型工程固结灌浆时参考. The engineering geological condition is complex in Qingjiang shuibuga Hydropower Stationsuchas such as high operating water head,light-weight cover on grout layer.testing method and technology of consolidated grouting in site are introduced and obtained test date are analyzed,design parameters are drawn for consolidated grouting under construction.The experience was accumulated for consolidated grouting in complex condition.The work is very useful for the further similar engineering of consolidated grouting.
作者 孙忠明 谢涛
出处 《南昌水专学报》 2004年第3期28-32,共5页 Journal of Nanchang College of Water Conservancy and Hydroelectric Power
关键词 水电站 固结灌浆 施工方法 试验分析 Hydropower station consolidated grouting constructed method test and analysis
  • 相关文献

参考文献1

二级参考文献11

共引文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部