从电气主接线,变压器选择,配电装置布置,继电保护配置,通讯通道,补偿器设置和电缆敷设等方面,介绍35 kV无人值守变电站设计要点。
From the selection of electric equipment, transformer, power distribution equipment, communication arrangement, relay protection equipment, communication passage, compensator arranging and the cable laying, introduced the design important points of 35kv self-service transformer substation.