以某炼钢厂旧工业厂房改造工程为例 ,介绍了在特殊环境下对旧有连铸机铸坑进行粘结螺栓和植筋的施工方法 。
By taking reconstruction project of the old industrial working shops in one steelmaking factory, for example,it introduces the methods of cohering spiral bolt and planting steel bar in old continuous casting pit in special environmental,which has referential significance for how to organize construction under the bad constructing conditions.
出处
《山西建筑》
2004年第18期94-95,共2页
Shanxi Architecture
关键词
连铸机铸坑
粘结螺栓
植筋
continuous casting maching casting pit,cohere spiral bolt,planting steel bar