摘要
本文就如何把施工期的临时排水设施和运行期的永久性排水设施以及排水设施与其它设施或其它用途相结合,一种设施多种功能,施工期的排水设施能被运行期的排水设施利用,以达到减少重复建设、降低成本、缩短工期、简化设施等做了一些探索。
The paper makes the following approaches: how to combine the temporary drainage facilities during the construction with the permanent drainage facilities during operation as well as the drainage facilities with other facilities or other usages. One facility has multi kinds of functions. The drainage facilities during construction can be uti- . lized by the drainage facilities during operation so as to reach to reduce repeated construction, reduce the cost, shorten the construction stage and simplify the facilities etc.
出处
《城市道桥与防洪》
2004年第5期28-34,共7页
Urban Roads Bridges & Flood Control
基金
2001年西部交通科技建设项目