摘要
介绍了在摩洛哥阿加第尔饮用水工程中,采用工程量清单进行投标报价的情况,分析了国内外采用该法的现状及特点,提出了与之相关的几点建议。
The Paper introduces things of adopting the method of bill of quantities for tendering offer in drinking water project in Agadir,Morocco.It also analyses the present situations and features of using this method at home and abroad and puts forward some suggestions accordingly.
出处
《有色金属设计》
2003年第4期63-65,共3页
Nonferrous Metals Design
关键词
工程量清单
计价依据
定额
综合单价
Bill of quantities
valuation basis
quota
comprehensive unit price