十里垅贮灰土坝坝基用砂井及预压处理软弱地基,根据水平位移和垂直沉降值,严格控制施工速率,并加强现场干密度控制及试验.
The soft foundation was treated by sand-fill well and prepressing for the shili long fly-ash dam. According to the horizontal displacement and vertical settlement, Keep the construction schedule under strict control strictly and strengthen the examination of dry density on the spot and test.
出处
《江西水利科技》
1993年第4期332-337,共6页
Jiangxi Hydraulic Science & Technology
关键词
土坝
软土地基
预压处理
Ash-fill dam
soft foundation
prepressing
Construction