摘要
本文主要讨论钻孔灌注桩灌注工艺及初灌量的确定,并结合现场实际施工情况对初灌方法作了改进,经实践证明是切实可行的。文中还结合施工实际情况,对浇灌过程中易发事故进行简单的分析,并提出预防措施。
This paper discusses the construction techniques of cast-in-situ bored piles and calculation of primary grouting volume and also provides the practical disposal methods of typical accident during grouting in light of construction of the Wenzhou United Plaza Project.
出处
《工程质量》
2004年第10期31-32,35,共3页
Construction Quality