期刊文献+

认知系统 被引量:3

The Cognitive System
下载PDF
导出
摘要 认知系统的过程可以组成四个范畴:(1)贮存与提取;(2)信息加工;(3)输入与输出;(4)知识运用. The processes within the cognitive system can be organized into four categories: (1) storage and retrieval, (2 ) information processing, (3) input/output, and (4)knowledge utilization. These mental processes act on the knowledge in the knowledge domains. That is, the storage and retrieval processes provide an individual with access to the knowledge that has been stored in permanent memory and a way of storing new knowledge so that it might be used at a later date. The information processing functions manipulate knowledge that has been stored so that it might be utilized for specific tasks. The inputoutput processes utilize knowledge to understand communication and generate communications. Finally, the knowledge utilization processes use knowledge to accomplish specific tasks. Each category of processes within the cognitive system is discussed below.
出处 《远程教育杂志》 2004年第5期15-20,60,共6页 Journal of Distance Education
  • 相关文献

同被引文献11

  • 1郭绍青,吴亚婕.教师学习资源中心的功能定位[J].中国电化教育,2005(9):40-42. 被引量:7
  • 2“中欧甘肃基础教育项目”教师学习资源中心(TLRC)研讨会报告[R].兰州.2006.
  • 3教师学习资源中心的意义和作用[DB/OL].http://www.jtvedu.com/ReadNews.asp?NewsID=544.
  • 4K P Ramaswamy , Satyanarayana N. Kalidindi(2009). Waste in indian building construction projects. Proceedings for the 17th Annual Conference of the International Group for Lean Construction, 3 - 14.
  • 5Qian Chen, A M ASCE, C, eorg Reichard, et al. Object model framework for interface modeling and it oriented interface management[J]. Journal of Construction Engineering and Management,2009,136(2) : 187 - 198.
  • 6EG Ochieng , A D F Price. Managing cross - cultural communication in multicultural construction project teams: The case of Kenya and UK[J]. Journal of Project Management , 2010,28: 449-460.
  • 7Tarcisio Abreu Saurin , Carlos Tones Formoso, Fabficio BoNes Cambraia. An analysis of construction safety best practices from a cognitive systems engineering perspective[J]. Journal of Safety Science, 2008,46:1169- 1183.
  • 8Bo Terje Kalsaas, John Skaar , Rein Terje Thorstensen. Implementation of last planner in a medium - sized construction site. Proceedings for the 17th Annual Conference of the International Group for Lean Construction,.
  • 9Hong Zhang, Jia Yuan Wang. Particle swarm optimization for construetion site unequal-area layout[J]. Journal of Construction Engineering and Management, 2008,134(9): 739- 748.
  • 10李文华.矿井安全绩效管理系统的要素构成分析[J].中国煤炭,2009,35(12):40-42. 被引量:1

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部