期刊文献+

水库移民系统重建中的联动监控方法研究 被引量:1

Study of Coordinated Supervisory Control Method in Reconstruction of Reservoir Resettlement System
下载PDF
导出
摘要 针对水库移民系统重建中的进度、质量和投资三方面的控制问题,突破传统做法,研究提出了"三维"联动监控思路。文中首先叙述了我国水库移民系统重建中的进度、质量和投资控制方法现状;提出将赢得值法运用到水库移民系统重建的目标监控中,并对其具体应用方法进行详细论述,且运用案例进行了实证分析。 Making a breakthrough in conventional practice the paper has put forward a philosophy of 'three-dimensional' coordinated supervisory control according to the control problems in connection with progress, quality and investment in reestablishment of the reservoir resettlement system. The authors have first recounted the current situation of the progress, quality and investment control method being used in the reservoir resettlement system in the country, suggested to apply the gain value method to the target supervisory control of the reservoir resettlement system, then detailed the method of application and finally made a verification analysis by using certain cases.
出处 《云南水力发电》 2004年第4期25-28,共4页 Yunnan Water Power
关键词 水库移民 实证分析 投资控制 进度 具体应用 质量 目标监控 赢得值 三维 reservoir resettlement reestablishment gain value method coordinated supervisory control
  • 相关文献

参考文献5

共引文献5

同被引文献4

引证文献1

二级引证文献31

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部