大坝混凝土骨料生产系统的线性优化 被引量:1

Linear Optimization of Concrete Aggregates Production System in Construction of Dams
下载PDF
导出
摘要 混凝土坝施工过程混凝土浇筑强度变化,其骨料生产强度也应随之。变化大小还取决于上阶段骨料的存储量和料仓的存储容积。为反映这生产过程相关因素的内在联系,建立了天然和人工骨料生产的线性优化数模,根据骨料的不同级配,可供利用的加工设备,骨料生产选取的不同工艺流程,用微机可实现骨料的均衡生产和生产过程的实时优化控制。使混凝土骨料生产既满足混凝土浇筑强度的要求,又达到经济节约的目的。通过实际工程生产数据的经验,证明所建立的线性优化数学模型及所编的计算程序,对指导骨料优化生产是切实可行,行之有效的。 The intensity of concrete aggregates production changes with that of concrete placement during construction of a concrete dam. Further, the change also depends on the storage of aggregates produced in the previous stage as well as the storage capacity. In order to know the internal relationships of the relevant factors in the course of aggregates production, a linear optimized mathematical model for production of both natural and crushed aggregates has been established, based on which a computer can be used to carry out balanced aggregates production and real-time optimized control of the production process according to different gradations of aggregates, available processing equipment and various technological process to be selected for production of various aggregates so that the production of concrete aggregates will not only satisfy the intensity requirement of concrete placement but also cost less. The concrete aggregates production data obtained from the practical projects have proved that the established linear optimized mathematical model and the developed computation program are practicable and effective in guiding optimized production of concrete aggregates.
出处 《云南水力发电》 2004年第4期57-62,共6页 Yunnan Water Power
关键词 人工骨料 大坝混凝土 混凝土坝 混凝土浇筑 级配 工程 施工过程 均衡生产 生产系统 经济 concrete aggregates systematic management linear optimization production process real-time optimization
  • 相关文献

参考文献6

  • 1王民寿,涂兴怀.混凝土人工骨料生产的过程优化[J].四川水力发电,1998,17(2):30-35. 被引量:3
  • 2Min-shou Wang.Jian-she Zhang The real time Optimal Conteol of production of Aggregates processing system Censtruction The third East Aisa-pacific Conference on structure Engineering & Construction.
  • 3R.J Ccpe F.Sawko R.G Tickell Computer methods for Cinil Engineers MC GRAW-HiLL Book Company (UK) Limited 1993.
  • 4王民寿.土木系统工程[M].成都科技大学,1988..
  • 5成都科技大学水电学院水利施工科研组.国家七五科技攻关大坝混凝土施工质量数据的实时跟踪及反馈[R].,..
  • 6王民寿.线性规划和建材供求规划施工组织设计最优化的一个问题[J].葛洲坝水电学院学报,1981,(1).

二级参考文献4

  • 1雷培先.高岭头水电站工程人工砂石料系统的工艺设计[J].水利电力施工机械,1993(4):19-22. 被引量:1
  • 2俞水福.系统工程在二滩水电站施工组织设计中的应用简介[J]水利水电技术,1990(06).
  • 3汪大彬,杨志帆.人工砂石系统最优设计方案的选择[J]水力发电,1985(02).
  • 4翁定伯,鲁绍栋.水利水电建设混凝土砂石料系统设计中几个问题的商榷[J]水利水电技术,1963(03).

共引文献2

同被引文献2

  • 1谭建平.水利水电工程砂石加工系统设计导则[Z].北京:中国电力出版社,1999..
  • 2郭文三.水利水电工程混凝土生产系统设计导则[Z].北京:中国电力出版社,1999..

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部