摘要
本文用网络分析法阐述了“工期一定,资源均衡”的优化理论。并应用这一理论对潘桥乡新建一桔园喷灌工程的施工进行了优化,从而产生了较好的经济效益和社会效益。
This paper presents an explanation of the theory of optimization on the situation of fixing construction period and balancing resources with network analysis. Meanwhile, the arrangement of a citru platation sprinkler irrigation project construction in Panqiao village was made by the above theory of optimization and have yielded good economic results and social benefits.
出处
《喷灌技术》
北大核心
1989年第1期12-15,64,共4页
关键词
网络分析法
喷灌工程
施工
network analysis
optimization
sprinkler irrigation project
construction.