摘要
首钢第二炼钢厂的两台8流方坯铸机,通过完善连铸技术工艺条件;加强生产组织,铸机设备检修及改造;提高操作技能等措施,较大幅度的降低断流率,进一步提高了连浇炉数和铸机生产效率,创出两台铸机年产坯量141.169万吨的新水平。
In the two 8 strand billet continuous casters of Capital Iron & Steel Corporation breaking outs of cast strand have been drastically reduced and heats of sequence casting as well as availability of the casters have been accordingly raised since the impelmentation of a series of counter measures by the Corporation including improvement in technical and processing conditions for continous casting, strengthening organization in production, timely maintenance, repairing and renovation of equipments of the casters and training the operators to raise their operating skill. As a consequence these two cast- ers have set a new record of annual output of 1411690 tons of billets.
出处
《炼钢》
CAS
北大核心
1993年第4期34-37,11,共5页
Steelmaking
关键词
方坯连铸机
断流率
生产效率
continuous caster
metallurgical effectiveness