摘要
阐述了年调节水库与地下水库联合调蓄的模拟分析方法,并通过对石佛寺水库与地下水库联合调蓄的模拟计算,确定了联合调蓄的供水规模及运行方式,最后对调蓄供水的风险性进行了分析。
Simulation analysis method was described for the combined annual-storage and groundwater reservoir regulation.By means of simulation calculation of the combined regulation of Shifosi Reservoir and groundwater reservoir regulation,water supply capacity and operating mode were determined.And finally,the risk analysis was made on water supply system.
出处
《中国给水排水》
CAS
CSCD
北大核心
2004年第11期49-51,共3页
China Water & Wastewater
关键词
联合调蓄
年调节水库
地下水库
风险性分析
combined regulation
annual-storage reservoir
groundwater reservoir
risk analysis