复杂地质条件下地连墙成槽工艺 被引量:2

Trenching Technology for Diaphragm Retaining Walls Under Complicated Geological Conditions
下载PDF
导出
摘要 阐述地质情况为回填积砂石,且地连墙要求穿过相临沉箱基床抛石的情况下,进行的地连墙施工,施工的重点与难点为地连墙成槽施工。施工中采取了一些有效的措施。 The paper describes the construction of underground diaphragm retaining walls,which had to be executed in backfilled sand and stones,and had to cut through the rubble mound foundation for the caissons adjacent to the diaphragm walls. The difficulties and key tasks of construction of the diaphragm retaining walls lie in the trenching operations for the walls. To overcome these difficulties,some effective measures were taken.
出处 《水运工程》 北大核心 2004年第11期129-131,共3页 Port & Waterway Engineering
关键词 地连墙 旋喷桩 成槽 diaphragm retaining walls jet grouting pile trenching