通过深圳地铁福民站地下连续墙的施工工艺进行成本分析 ,为同类工程积累了造价资料 ,也为今后的工作提供了参考资料。
Through the cost analysis of the construction process of the underground continuous wall beneath Fumin Station of Shenzhen Metro, cost data are herein accumulated for projects of similar nature with reference info provided for the work in the future.
出处
《铁路工程造价管理》
2004年第6期38-41,共4页
Railway Engineering Cost Management