摘要
针对天生桥--广州直流输电工程中广州换流站交流滤波器在系统调试和运行中的存在的问题,指出了滤波器设计中的不合理因素,并提出了可能的最佳配置方案。
According to the existent problems in system commissioning and operation for AC filter in Guangzhou converter station in Tianshengqiao-Guangzhou HVDC transmission project, this paper points out the not reasonable factors in the design of filter, and puts forward the possible and optimal disposition scheme.
出处
《电力设备》
2004年第11期14-17,共4页
Electrical Equipment