摘要 小龙潭露天煤矿连采成套设备的带式输送机直接使用6kV高压电源,经两年多的调试和运行后通过验收和投入生产。文章侧重介绍这套输送机高压电气系统在现场调试发现的问题及排除方法。 The belt conveyors of the continuous mining complex of the Xiao Long Tan open coal mine use 6kV high voltage power supply and have been accepted after two years' adjustment, investigation and operation.This paper mainly presents the troubles of the high voltage electric system found during its field investigation and the way of their elimination.
作者 王熙祖
出处 《起重运输机械》 1989年第5期36-42,共7页 Hoisting and Conveying Machinery