期刊文献+

三峡电源电站地下厂房岩锚梁开挖施工技术 被引量:4

Excavation construction technology of anchored rock beam for the underground powerhouse of Three Gorges Power Supply Plant
下载PDF
导出
摘要  三峡电源电站地下厂房岩锚梁开挖施工,采用双向光面控制爆破技术一次开挖成型,就该工程岩锚梁开挖时机选择、钻孔精度的控制、爆破设计方案等进行论述,检测结果表明,所采用的施工方案科学、有效,满足设计开挖要求. A double-direction controlled formed and smooth blasting technology was used to excavate an anchored rock beam in the underground powerhouse at the Three Gorges Power Supply Plant. Some problems concerning the time choice, accuracy control and design solution for the blasting were discussed. The results of investigation have showed that the method developed is scientific and effective, enabling to satisfy the excavation requirements by designers.
出处 《水利水电技术》 CSCD 北大核心 2004年第11期42-45,共4页 Water Resources and Hydropower Engineering
关键词 地下厂房 岩锚梁岩台 开挖技术 三峡电源电站 underground powerhouse rock platform for anchored beam excavation technology Three Gorges Power Supply Plant
  • 相关文献

参考文献3

二级参考文献1

  • 1中国力学学会工程爆破专业委员会.爆破工程[M].北京:冶金工业出版社,1992..

共引文献1

同被引文献38

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部