摘要
针对柘林水电站实际的安全及经济运行问题,采用多重动态规划模型进行模拟并详细介绍求解步骤.通过求解模型获得电站内各台机组在给定日负荷计划下的最佳负荷运行分配方案.实际应用表明,本文方法不仅能有效地解决柘林水电站的安全及经济运行问题,而且能够显著提高电站的管理水平.
The multiple dynamic programming model was used to simulate the safe and economical operation of the Zhelin Hydropower Station, and the detailed steps for the solution of the model were proposed. The optimal load distribution scheme for the operation of each unit was obtained under the planned daily load. Practices show that the method can not only solve the problem of the safe and economical operation of the station, but also greatly improve the management of the hydropower station.
出处
《水利水电科技进展》
CSCD
2004年第5期48-51,共4页
Advances in Science and Technology of Water Resources
关键词
水电站
安全经济运行
动态规划
多重动态规划
hydropower station
safe and economic operation, dynamic programming
multiple dynamic programming