期刊文献+

三峡工程二期深水高土石围堰的科技攻关及其实践检验 被引量:3

Keytechnology Tackling on TGP 2nd Stage High EarthRock Cofferdam in Deepwater and Its Examination in Practice
下载PDF
导出
摘要 三峡工程二期深水围堰水深60m,堰高80m,是三峡工程重大技术问题之一,用传统的斜墙铺盖方案不可靠,为此,1979年开始结合葛洲坝大江上游围堰设计施工中的成功经验进行科技攻关。三峡围堰方案将葛洲坝围堰所采用的堰体防渗墙方案作为攻关的主攻方向。经"七五"、"八五"攻关解决了主要的技术问题,其成果用于设计和施工。施工及运行结果证明,攻关提出方案和主要技术措施是成功的。 The construction of second stage cofferdam with a height of 80 m in waterdepth 60 m is one of keyXtechnology problems of TGP. A new keytechnology tackling topic about deepwater cofferdam was started in 1979 in combination with the desigh and construction of upstream cofferdam of main channel of Gezhouba Project, where instead of traditional inclined blunket scheme, a vertical impervious cutoff wall inside the cofferdam scheme had been successfully used under water depth 20 m. Primary technology problems were detailedly resolved through the National Keytechnology R&D Program of China during'Seventh and Eighth FiveYear Plan Periods'. The study results were adopted in TGP design. The smooth construction and safe operation over 4 years proved that the recommended scheme and main technology measures are successful.
作者 司兆乐
出处 《长江科学院院报》 CSCD 北大核心 2004年第6期1-6,共6页 Journal of Changjiang River Scientific Research Institute
关键词 三峡工程 深水围堰 “七五”攻关 TGP(Three Gorges Project) deepwater cofferdam National Keytechnology R&D Program during 'Seventh FiveYearPlan Peried'
  • 相关文献

参考文献2

  • 1[1]司兆乐,包承纲. 三峡枢纽二期深水围堰施工技术研究专题总报告("七五"国家重点科技攻关(75-16-4-1))[R]. 武汉:长江科学院,1990.
  • 2[2]徐唐锦,李勤军. 长江三峡水利枢纽大江截流及二期围堰合同项目竣工验收"上游围堰设计报告"[R]. 武汉:长江水利委员会. 1999.

同被引文献20

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部