摘要
对国产首台燃用褐煤的135MW等级循环流化床锅炉的设计特点及运行实绩进行了较详细的介绍,并结合燃用褐煤及高海拔低气压等设计条件进行了分析研究。
Introduces detailedly the design characteristic and operation reference to first domestic produced 135 MW class CFB boiler fired lignite, and takes the analysis of the design condition such as high elevation and low pressure with fired lignite.
出处
《锅炉制造》
2004年第4期8-10,共3页
Boiler Manufacturing
关键词
CFB
褐煤
设计
运行
CFB
lignite
design
operation