摘要
介绍了小煤柱大跨度巷道群在受到构造和采动双重影响下,应用动态信息设计法,建立大模型模拟不同加固方案与支护参数,从而选择出最佳方案,同时分析了矿压监测结果,显示该加固方案具有较高的合理性和可靠性。
This paper introduces dynamic information method under small coal pillar and large over-the-roadway roadway groups influnenced by full extraction and structure,building large model simulates diffierent reinforcing scheme and supporting parameter,the best scheme is obtained,through analyzing rock pressure,this method is rational and reliable.
出处
《煤》
2004年第4期9-11,共3页
Coal
关键词
小煤柱
大跨度
巷道群
预应力锚索
small coal pillar
large over-the-roadway
roadway groups
prefensioned cable anchor