福州火车站主站房膜结构工程包括12个倒锥伞形膜单元,总面积近7000m2。叙述了其设计、制作和施工的整个过程以及所需解决的主要问题。
The film structure of the main station building of Fuzhou Railway Station consists of 12 inversed-cone umbrella-shape film units and its total area is about 7000 square meters. In this article, the author introduces some aspects of this film structure project such as design, manufacture, construction and some main problems which should be solved in its construction process.
出处
《施工技术》
CAS
北大核心
2004年第11期71-72,40,共3页
Construction Technology
关键词
张拉膜结构
找形
裁剪
tension film structure
shape-fixing
cutting