期刊文献+

Contract for new Scottish hydro station

下载PDF
导出
摘要 A£4M (US$6M) Contract has been awarded to Miller Civil Engineering Services for the construction of Scottish and Southern Energy's new 3MW hydro power station on the river Cuileig, near Ullapoot in Scotland, The plant will be the pow, er company's first new hydroelectric station since the 1960s. Construction is set to take 12 months, beginning in mid November,
出处 《Small Hydro Power News》 2002年第67期20-20,共1页 小水电新闻(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部