2 0 0 2年 1~ 4月包钢 3# 高炉进行了中修 ,并对炉腹、炉腰及炉腰下部冷却设备的结构形式进行了改造。经过两年的运行 ,取得了较好的冷却效果。
An intermediate maintenance was carried out for Baogang No. 3 blast furnace during January to April, 2002, and the structure of cooling equipment for each part of the furnace was modified at the same time. After 2 years running, the furnace has proved to have a good cooling effect.