摘要
宝钢热轧厂是在四级计算机组成的CIMS的管理和控制下运行的。该系统的组合实现了CAD、CAM和CAPP。借助于计算机系统和工艺、设备的综合能力实现了FMS,在大生产过程中能充分满足用户的订货要求。系统的MRPⅡ对前工序的原料供应以Just in time的原则进行规划。TQC以融于生产管理和控制全过程的方式得以充分实现。
The hot strip mill of BISC has been managed and controlled by a CIMS which is composed of a four-level computer system since its beginning of production.The combination of the system realizes CAD, CAM and CAPP. With the help of the computer system and integrated ability of technology and facility, FMS is achieved to ensure that the order requirement of each customer can be satisfied during the process of mass production, MRP-Ⅱ in this system has programmed the material supply of former section based on the principle 'Just in time'. TQC has been completely fulfilled as it has run through the whole process of production.
出处
《钢铁》
CAS
CSCD
北大核心
1993年第11期35-39,共5页
Iron and Steel