摘要
介绍了煤矿坑道大直径水平长钻孔的工业性试验情况。试验中使用定向钻进技术施工了 4个钻孔 ,两个钻孔长度达到 80 0m以上 ,试验钻孔最深 86 5m ,其中 85 5m保持在煤层中连续延伸 ,孔径 15 3mm ,最高时效达到 2 8m/h。文中还对试验中遇到的问题提出了自己的见解。
It is introduced that the industrial test about large diameter horizontal long drilling hole, and put forward personal viewpoint to question met on test. Totally four hole had been executed using directional drilling technology. Two drilling hole depth is more than 800 m, and the longest drilling hole is 865 m in length, drilling hole diameter is up to 153 mm, the highest sheet drilling speed is up to 28 m/h.
出处
《煤田地质与勘探》
CAS
CSCD
北大核心
2004年第6期61-63,共3页
Coal Geology & Exploration
关键词
煤矿坑道
大直径水平长钻孔
工业性试验
the coalmine tunnel
the large diameter horizontal long drilling hole
industrial test